END OF THE LINE two

The end of the line has change a bit to include a weighbridge and office.Once again Polak static grass and MiniNatur grass tufts have been used. All thats needed now are some decent ho scale railway workers to have around the place.

Advertisements

About BURROWA

Retired 69 year old model railway enthusiast.Likes, NSWGR LNER railways.Music, Mozart Beethoven, Elgar, Beatles, Rolling Stones,Miles Davis and many more.
This entry was posted in Buildings & Structures, Landscape. Bookmark the permalink.

4 Responses to END OF THE LINE two

  1. Hi Peter,
    Lovely work…is the weighbridge scratch built or a kit?

    Cheers.
    Rob

  2. BURROWA says:

    Hi Rob. Thanks for the comment.The weighbridge is scratch built however there are both timber and concrete era kits from Stephen Johnson Models I hope that helps you.Regards Peter

  3. Ben says:

    Peter,
    The grass looks very authentic, any chance you could do a post on how you achieve this?
    Ben (sparksey4869)

  4. Jack says:

    Hi Peter,
    Jut let you know, I have changed the address to my shop to http://allscalesmodels.com
    I kept your account with all your points , so you can use the same login
    Regards
    Jack

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s